Tailing Cooling Tower Installation Instructions
1. Refer to the operating weight of the cooling tower and the actual installation factor to check the bearing capacity of the installed foundation.
2. The cooling tower is installed in a place with good typhoon and no influence from buildings.
3. There should be a certain distance between the air inlet and the building to ensure that fresh air enters and avoids the return of damp and hot air.
4. If gas welding or electric welding is used at the installation site of the entrance tower, there should be fire safety facilities to avoid fire.
5. Avoid places where the installation site uses high heat sources, dust, corrosive gases, and foreign objects.
6. The cooling tower should be made according to the requirements of the manual. The foundation surface should be on the same horizontal surface with an elevation error of ± 3mm, otherwise measures should be taken to ensure that the cooling tower is installed level.
7. When assembling the chassis for back sealing, the joints should be treated cleanly, and ensure that the resin can be painted and fiber mats can be laid on the joints only when it is dry.
8. When formulating the resin, the amount of each preparation is 1KG as the most suitable, and the maximum is no more than 2KG, so as to avoid the resin curing and cause waste. The ratio of resin and curing agent is 100: 2 (it can be properly increased when the temperature is low, and can be appropriately reduced when the temperature is high)